The Manor Central Park – Phase 2

投资者: BITEXCO Group

场地: 低层建筑 室内装修及安装 景观技术基础设施 电气系统

包裹: Piling, Structure, Exterior & Interior finishing works for 67 units and infrastructure, landscape works of the Block 15 and Construction works for all infrastructure, power, water, lighting, fire-fighting systems, landscape and parks for phase 2

咨询单位: BUREAU VERITAS

施工进度: December 2020 to October 2023

地址: Dai Kim Ward, Hoang Mai District and Thanh Liet Commune, Thanh Tri District, Hanoi

分享到网站:

规模

项目

+ Total area: 90 hectares.
+ Including 1066 lots of low-rise villas, townhouses, and commercial townhouses.
+ Central Park: 7 hectares and 5 finger parks.
+ High-rise building block: 17 high-rise buildings with about 7550 apartments with height from 35 to 55 floors, 2 iconic multi-function buildings of the project with a height of 65 floors, 2 iconic towers, 1 office building.

总面积

90 hectares

履行

项目

+ Construction of infrastructure, landscape park, lighting system for phase 2 of the project over total area of 40 hectares: December 2020 to June 2022.
+ As General Contractor, completed construction of 67 villas with total construction floor area of 25.000m2