The Manor Central Park – Phase 2

Investor: BITEXCO Group

Field: Electrical systems Infrastructure, engineering, landscape Interior finishing and fit-out Low-rise buildings

Bidding package: Piling, Structure, Exterior & Interior finishing works for 67 units and infrastructure, landscape works of the Block 15 and Construction works for all infrastructure, power, water, lighting, fire-fighting systems, landscape and parks for phase 2

Consulting unit: BUREAU VERITAS

Construction progress: December 2020 to October 2023

Address: Dai Kim Ward, Hoang Mai District and Thanh Liet Commune, Thanh Tri District, Hanoi

Share to websites:

Size

Project

+ Total area: 90 hectares.
+ Including 1066 lots of low-rise villas, townhouses, and commercial townhouses.
+ Central Park: 7 hectares and 5 finger parks.
+ High-rise building block: 17 high-rise buildings with about 7550 apartments with height from 35 to 55 floors, 2 iconic multi-function buildings of the project with a height of 65 floors, 2 iconic towers, 1 office building.

Total area

90 ha.

Implementation

Project

+ Construction of infrastructure, landscape park, lighting system for phase 2 of the project over total area of 40 hectares: December 2020 to June 2022.
+ As General Contractor, completed construction of 67 villas with total construction floor area of 25.000m2.
+ VIJAKO has carried out 13 packages at the project, all of which received high appreciation from the Owner and Bureau Veritas Construction Management Consultant.